You don't have javascript enabled. Good luck with that.
Pencarian
Anggaran Pengadaan Listrik Dicoret, RPH Babi Kapuk Batal Beroperasi

Pig Slaughterhouse Operational in W. Jakarta Delayed

A pig slaughterhouse at RW 04, Kapuk Urban Village, Cengkareng, West Jakarta, which built in a modern cannot be operated yet. This is because, the Jakarta Financial Management Body (BPKD) has crossed out fund for electricity supply worth Rp 3 billion.

Supposedly, the pig slaughterhouse already been operated. But the fund for electricity supply is crossed out

Initially, West Jakarta Administration planned to operate the pig slaughterhouse in January 2015. The slaughterhouse itself was built with a waste water processing system (ipal) and modern clipper.

"Supposedly, the pig slaughterhouse already been operated. But the fund for electricity supply is crossed out, whereas it has passed the Goods and Services Procurement Agency (ULP)," Head of Jakarta Marine and Agriculture Department, Darjamuni, Tuesday (11/4).

18 Chicken Slaughterhouses in Johar Baru Sealed

Darjamuni disclosed that such slaughterhouse stands on the land as wide as 1.7 hectares is located opposite the old slaughterhouse. "The RPH development is an expectation of Mr. Joko 'Jokowi' Widodo not to disturb the local citizens," he expressed.

On the other hand, delay in the slaughterhouse operational is also automatically hampering the market demand for pork, from 500 pork chops to 1,000 pork chops per day.

Meanwhile, the current pig slaughterhouse is far from hygienic requirement. Rotten smell spread from the building was already very sting, because the waste carelessly discarded into the drains.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1105 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye995 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye950 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye725 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye626 personAnita Karyati